Skip to content

Smart DBB Valve Technology

DBB Valves: Traditional installations of DBB Valve systems at plants are very time consuming and an expensive practice. A traditional system consists of two single ball valves, a needle valve, various connectors, adaptors and flanges. There are many steps to consider when completing the installation process. In total, there can be as many as 41 steps required for a traditional installation of DBB valves setup.

Cost reduction of 30% up to 80% for installation

There is only one step for the installation when using a Compact Dual Body DBB Valve unlike the 41 steps using the traditional system.

Using DBB Valves brings end-users a cost reduction of 30% up to 80% for installation.

Besides that, using DBB Valves also reduces the installation time from 2-3 days to only a few hours.

Do you have more technical requests? Don`t hesitate to contact our DBB experts.